A Bold Proposition to Connect the Supply Chain
In manufacturing, data drives decisions and prompts actions. Without visibility of information, businesses can suffer disruption and ongoing efficiency and quality issues.
Large manufacturing and production OEMs may have granular visibility into valuable data within their factories. However, a digital divide separates them from receiving data from the supply base.
According to SCORE, a resource partner for the U.S. Small Business Administration, 98.6% of all manufacturing companies in the U.S. are small businesses with fewer than 500 employees. These manufacturers are vital supply chain components but likely rely on clipboards and Excel spreadsheets for data capture. Manually feeding the data stores creates three issues:
· Abundance of data errors
· Delayed availability of data
· Information gaps for items not deemed critical to operations.
To get insights into incidents and events that could hobble their operations, OEMs must reach out to the supply base with information requests or deploy resources to fix issues. For example, much of my time at General Motors, Tesla and Alta Motors was spent chasing down information from suppliers to eliminate risk.
There must be a better way to address the daily firefighting of manufacturing—and that better way is connected supply chains.
Slow Progress
Connecting supply chains is not a new or novel idea, but over the past two decades, manufacturers, excluding those making pharmaceuticals, have made little progress on this front. I believe there are two reasons for the lack of change: supplier access to the technologies and OEMs not taking ownership of the problem.
Legacy best-of-breed platforms that cater to large corporations impede small manufacturers’ accessibility to the technologies for connection. In the manufacturing execution systems (MES) realm, the impediments include huge upfront and ongoing expenses, rigid platforms requiring expensive systems integrations and customizations and ongoing reliance on developers to make modifications as the workflow changes. Time is also a consideration; estimates range from 6 to 18 months for implementation, depending on whom you ask.
“What is a connected supply chain?”
Each member of a connected supply chain, no matter its size, has a digital backbone capable of collecting, organizing and sharing data for internal and external use. Connecting those digital backbones ensures that all disparate systems, technologies and networks are linked to provide an unimpeded flow of digital data between customers and suppliers. While pandemic-induced supply chain disruptions prompted a focus on the flow of goods (inventory), a connected supply chain transmits information that drills down on every operation, every component in the manufacturing processes.
Time, effort and cost concerns are being addressed with new solutions to collect and share critical operational data. Yet the perceptions forged by the legacy platforms live on.
In some supplier circles, there's also a perception that revealing too much about company operations to customers gives the buyer too much leverage. However, I think most suppliers are eager to collaborate and have a voice, given the opportunity to be a player (not a pawn) in the connected supply chain.
Left unchanged, the data disconnect puts all parties in jeopardy.
As I have seen firsthand, crucial decisions such as shutting down a line or an entire factory due to a component problem are often made without the benefit of data because there isn't enough time to get a supplier's response.
During one of my assignments at General Motors, the plant was producing a Duramax truck every 53 seconds. If an operator found a component issue, a line-side engineer had 53 seconds before the next truck came along to decide whether there was one bad part or all parts in the factory were bad; seven minutes before that section of the line shut down; and 30 minutes before the entire factory shut down.
With a disconnected supply chain, data to discover the extent of defective parts takes hours or days to receive from the supplier. So, the line-side engineer must make a critical decision without all the facts.
That’s just one example from my time in automotive manufacturing. There are countless others where the digital divide creates problems, such as the bullwhip effect on inventory, OEM inefficiencies for gathering needed intel and OEM expenses for quality engineers to travel to suppliers’ factories to assist in solving a vendor issue.
A Top-Down Approach
To erase the digital divide and connect the supply chain, my bold proposition is a top-down approach where OEMs pave the way for suppliers to connect their data streams. When done collaboratively, this erases the factors contributing to supplier reluctance. With each supplier that connects, another node to the connected supply chain is created.
By doing so, the OEM now has real-time (and accurate) data from the suppliers’ manufacturing operations. The bonus benefit is efficiency improvements, due to an MES implementation by the suppliers, which makes the supply chain stronger and more resilient.
I see this plan as a phased approach. The OEM would start with a two-company pilot as proof of concept. Then, it would pursue a limited rollout, focusing on a mix of suppliers that manufacture high-risk components and those that are trusted and easy to work with. The last phase is a full rollout to the supply chain with the OEM funding some of the implementations and promoting implementation to others with contract expectations of being a connected supplier.
Daily, manufacturers experience the impact of the digital divide. It’s time to own the problem and solve it. The alternative is to keep pointing fingers at the suppliers as the root cause, hoping and praying for better days.
Pico MES Co-founder and CEO Ryan Kuhlenbeck’s career spans a wide range of automotive manufacturing at General Motors, Tesla, and Alta Motors. He has experienced firsthand the real-world issues that the digital divide creates. Personally, those issues translated to 150,000 domestic air miles in one year for onsite supplier visits.